Call Steve 403-376-0077 or Email steve@containment.ca

Call George 403-861-1170 or Email george@containment.ca

We strive to provide Our Customers with Valuable Information and Excellent Support.

Rocky Mountain Containment
Poly Spray Services

We utilize specialized Liquid Polyurea and Liquid Polyurethane Spray on Coatings tailored for primary and secondary containment in oilfield, industrial and municipal applications.



These products are unrivalled in Strength|Durability| Impact Tolerance|Chemical Resistance|Fast Curing |Superior Elastomeric Qualities.
They are the Perfect Sollution for Today's ENVIRONMENTAL PROTECTION.



Why choose Us?

Environmentaly EngineeredUsing SCIENCE and TECHNOLOGY to Secure Our Environment.

The SOLVENTLESS polyurea and polyurethane elastomers are engineered to conform to substrates and mold a custom coating in place. The elastomeric quality allows the coating to shift with the substrate and EXPAND and CONTRACT with weather conditions without being compromised.

Group Fitness

Superior Containment Results DEDICATED to Protecting Our Environment.

The coating can be applied directly to substrates with superior containment results. Our standard coating is 100 mils thick, however custom thicknesses can be created. Fast curing allows for rapid completion of projects.

Why choose Us?

RCM - leading in Environmental Protection ENVIRONMENTAL BENEFITS of RCM's Products and Process.

The benefit of spray-on applications over other products is that they adhere to the substrate, are durable enough to withstand physical or environmental stress factors and do not tear, creating an effective and reliable liner.

Product Benefits

For over 15 years Rocky Mountain Containment has delivered excellent containment results for Oil & Gas, Industrial, Commercial and Municipal applications.



Meets and Exceeds Alberta D55

RMC’s superior product and professional application is recognized by the AER as an industry leader.

Alberta D55

Cost Effective

These durable, chemically resistant, easily cleaned and repaired products provide up to 20 years of trouble free containment. This is the best long term and cost effective option compared to products that may fail or need to be replaced often.

Direct Application to Substrates

Only spray on products can be applied directly to substrates to coat, contain and protect. Alternative products are unable to adhere directly to substrates and may not guarantee containment.

Excellent Corrosion, Abrasion, Chemical & UV Resistance

The superior durability will outlast and outperform HDPE and other polyurethane products by resisting all oils, most solvents, caustics and acids. Products are UV resistance and will not break down with exposure to sun and extreme environments

High Cohesive Strength

Products have superior elastomeric and cohesive strength properties that create a more durable coating. These coatings withstand temperature fluctuations, substrate movement and high traffic volumes. Ideal for high traffic areas – by injecting sand and creating a custom thickness with a one coat application.

Economical Spill Clean-Up & Easy Repair

Durable coatings facilitate simple clean up by washing with pressure washers and removing spilled materials with vacuum trucks. This saves considerable time and money when compared with alternate liners that may require sand (and substrate) removal and remediation as well as installation of a new liner. Most repairs can be done quickly and effectively utilizing a ”hand pour” method or RMC’s technologically advanced portable repair gun. Repair procedures for other projects can be extensive and unsatisfactory.

Year Round Application – Cold Temperatures (-20c)

Has been formulated for application in low temperatures whereas HDPE liners may crack or break during installations in cold temperatures.

Slip Resistant Coating

RMC can apply a slip resistant coating to enhance project safety and durability.



Fast Curing Time – Reduces Impact to Project Timelines

Product sets in 15 seconds; dries in 20 minutes; completely cures in 24 hours. Faster set times improves project scheduling without compromising site and personnel safety.